Project update / September ( II )

7. North Hall Framing completed and passed the inspection.
Picture
Picture
7-1. Doorway from North Hall to Mid Hall.
Picture
7-2. Electrical Panel Closet.
Picture
7-3. North Hall Audio/Video Equipment Closet.
Picture
7-4. North Hall and Mid Hall Shared A/V Closet.
Picture
7-5. Mid Hall Restrooms and Storage Partitions.
Picture
Picture
Picture
Picture
7-6. South East Wing Restroom and Storage Partitions.
Picture
Picture
Picture
Picture
8. Mid Hall Ceiling Framing.
8-1. Ceiling over the Entrance to Mid Hall Men’s Restroom.
Picture
8-2. Ceiling over Entrance to Mid Hall Women’s Restroom and Storage.
Picture
8-3. Due to the high ceiling, it took 4 people to install each metal stud.
Picture
Picture
Picture
9. Main Hall Ceiling Framing.
Picture
Picture
Picture
Picture
Picture
10. Installing Air Conditioning Ducting.
10-1. Installing North Hall Air Conditioning Ducting.
Picture
Picture
Picture
Picture
10-2. Padded ducting material for better insulation and also served as acoustic lining.
Picture
Picture
10-3. Installing Mid Hall Air Conditioning Ducting.
Picture
Picture
10-4. Installing Main Hall Air Conditioning Ducting.
Picture
Picture
Picture
Picture
Picture
11. Installing eave of the Mid Hall on the west side.
Picture
Picture
Picture
Picture
12. Building & Ground Dept is working on bring utility to Project Site.
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
13. More Structure Reinforcement Work.
Picture
Picture