Project update / October ( I )

1. Main Hall HVAC Ducting Completed.
1-1. Ducting for the return air.
Picture
1-2. Holes cut for the return vents.
Picture
1-3. Ducting for the West Wall.
Picture
1-4. Holes cut for the vents.
Picture
1-5. Ducting for the South Wall.
Picture
1-6. Holes cut for the vents.
Picture
Picture
Picture
1-7. Main Hall Ducting for the East Wall.
Picture
2. Mid Hall HVAC Ducting Completed.
2-1. Modify framing for HVAC vents.
Picture
Picture
2-2. Cutting holes in the ducting for the vents.
Picture
2-3. Holes cut for vent for Mid Hall System.
Picture
2-4. Return Ducting for Mid Hall System.
Picture
2-5. Indoor Unit for the Mid Hall System.
Picture
2-6. Ducting for the Mid Hall Storage.
Picture
Picture
Picture
3. Framing North Hall Bulk Head encasing A/C Vents.
Picture
4. Finishing Main Hall Ceiling Framing.
Picture
Picture
Picture
5. Start framing the North Hall window openings.
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
Picture
6. Start framing the Mid Hall window openings.
Picture
Picture
7. Start closing the infills.
7-1. Using electric pick to cut away the bull nose openings.
Picture
7-2. Fill and screw the plywood into the opening.
Picture
7-3. Exterior.
Picture
7-4. Interior.
Picture
7-5. Exterior.
Picture
Picture
7-6. Interior.
Picture
7-7. Exterior – All exterior surface will be covered by fiberglass mat gypsum sheathing. providing superior moisture and mold resistance.
Picture
7-8. Interior.
Picture
7-9. Exterior.
Picture
7-10. Interior.
Picture