Project update / May ( II )

11. Installing vapor barrier and insulation in South West Wing and passed inspection.
Picture
Picture
12. Hatch for Path to Old Kitchen.
Picture
13. Main Hall Men’s Restroom.
Picture
14. Install vapor barrier, insulation, rebar and radiant floor heat tubing in Mid Hall, passed all inspections and prepared for concrete pour.
Picture
Picture
Picture
15. Plans to remove the 4 columns in North Hall has been stamped by engineer, approved by County, and the work has begun.
15-1. 4 I-beam delivered.
Picture
15-2. Getting ready to prop up the ceiling in North Hall.
Picture
15-3. Ceiling Propped Up plate to existing I-beam.
Picture
Picture
15-4. Welding the existing for added strength.
Picture
Picture
Picture
Picture