Project update / May ( I )

1. Completed installing rebar in Main Hall and Main Hall Men’s Room and passed inspection.
Picture
Picture
Picture
2. Completed install ingradiant floor heating tubing in Main Hall and Main Hall Men’s Room and passed inspection.
Picture
Picture
Picture
3. Shotcrete 5 in fills in North Hall and Main Hall.
3-1. Forming the board for shotcrete.
Picture
Picture
Picture
3-2. Installing rebar.
Picture
Picture
Picture
3-3. Shooting shotcrete.
Picture
Picture
Picture
3-4. Smoothing it.
Picture
3-5. New Walls.
Picture
4. Pouring Main Hall Concrete Floor and Passed the Inspection.
4-1. Using a Concrete Pumping Crane.
Picture
Picture
Picture
4-2. Going through a window.
Picture
Picture
4-3. Many different steps to get the job done.
Picture
Picture
4-4. Scored Concrete Floor.
Picture
Picture
5. Cutting doorway in storage area South East Wing.
Picture
6. Forming South East Wing Storage Area for concrete pour.
Picture
Picture
7. Filling the gap where the original steps were with concrete.
Picture
8. Installing Rebar in South East Wing.
Picture
Picture
Picture
9. Installed Radiant Floor Heating Tubing in South East Wing and passed inspection.
Picture
Picture
Picture
10. Pouring Concrete for South East Wing Storage and Main Hall Men’s Restroom.