16. Formed and poured concrete foundation for statue platform.
|
17. Drill holes in Main Hall wall and filled with Epoxy to strengthening the connection between Main Hall and South East Wing.
|
18. Fabricated the support structure for the statue and welded it to the steel plates casted in the concrete pad built for that purpose. The support structure was also painted with rust proof paint.
|
19. Earth Store Bodhisattva Statue arrived on April 6, and welded to the support base on April 8 ; Waiting in Taiwan On the Way to Ji Long Port.
|
20. Arriving CTTB; Arriving Earth Store Hall.
|
25. Taking way the cut steel.
|
30. Securly Positioned and Welded.
|
31. Main Hall and Main Hall Men’s and Women’s restroom electrical conduit passed inspection.
|
32. Filling Main Hall tranches.
|